Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ

Archives

  • September 2026
  • August 2026
  • July 2026

Categories

  • Uncategorized
  • ଓଡିଶା
  • ଜିଲ୍ଲା
  • ଦେଶ ବିଦେଶ
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ
Subscribe
Close

Search

ଦେଶ ବିଦେଶ

Nitin Gadkari says Rs 61,500 crore, 630-km highway corridor to link Siliguri with Guwahati, Shillong; high-speed between UP & North East in works to cut travel time drastically

By admin
September 29, 2026 3 Min Read
0
Spread the love


Nitin Gadkari says Rs 61,500 crore, 630-km highway corridor to link Siliguri with Guwahati, Shillong; high-speed between UP & North East in works to cut travel time drastically
Gadkari described the 630-km corridor as the “lifeline” of the North East. (Image for representative purpose only)

High-speed highway connectivity is in the works for the North-East connecting it to Uttar Pradesh in the future. Road transport and highways minister Nitin Gadkari on Monday said that the government will soon take up construction of a 630-km corridor linking Siliguri in West Bengal with Guwahati in Assam and Shillong in Meghalaya.The project is estimated to cost Rs 61,500 crore. The road transport ministry has also initiated an expressway connectivity project between Gorakhpur in Uttar Pradesh and Siliguri. Once these projects are complete, a high-speed highway connectivity will be established between Uttar Pradesh and the North East.

630 km highway push for North East

Speaking at an event, Gadkari described the 630-km corridor as the “lifeline” of the North East, according to this TOI report. The project will combine new greenfield stretches with the upgradation of existing highways, with the aim of providing seamless connectivity across the entire route.The first part of the corridor will cover the 400-km stretch between Siliguri and Guwahati and is expected to involve an investment of Rs 30,000 crore. Gadkari said the alignment for this section is currently awaiting approval.“This has been proposed to improve connectivity between West Bengal and North East, and also the strategic Chicken’s Neck,” Gadkari said.The second section will link Jorabat in Guwahati with Barapani in Shillong. According to Gadkari, the greenfield road will bring down the existing distance from 100 km to 66 km. It will also reduce the travel time from around two-and-a-half hours to just one hour.The third leg will be a 165-km greenfield highway connecting Shillong with Silchar. Gadkari said the work order for this section is expected to be issued in November.“This corridor will reduce the current 230 km to barely 165 km. The travel time will also be reduced by half – from the current eight hours to only four hours,” Gadkari said.Gadkari also said that 265 projects spanning around 4,700 km are currently being undertaken in Assam. These projects have an estimated cost of nearly Rs 2 lakh crore. In addition, another 31 projects covering approximately 1,470 km have been planned at an estimated cost of Rs 92,000 crore.

Connectivity in North-East

A cumulative Rs 6.11 lakh crore was spent on development in the North Eastern Region (NER) between 2014-15 and 2024-25, against a cumulative allocation of Rs 6.02 lakh crore (RE), according to government data.In addition, several infrastructure projects have been completed across different sectors through various schemes of the Union government.Road Connectivity: The National Highway network in the North Eastern Region has expanded considerably. The total length of National Highways increased from 10,905 km in 2014 to 16,207 km as of March 31, 2025.Over the past decade, the Pradhan Mantri Gram Sadak Yojana (PMGSY) has also led to the construction of 46,296 km of rural roads across the NER, involving expenditure of Rs 47,279 crore.Railway Connectivity: Railway investment in the North Eastern Region has risen substantially in recent years. The annual budget allocation for the railway sector has increased from Rs. 2,122 crore during the 2009-14 period to Rs. 10,440 crore in FY 2025-26.Several railway projects currently under implementation are aimed at strengthening infrastructure connectivity under the Act East Policy. These include the Bhairabi-Sairang New Line (51 km), Agartala-Sabroom New Line (112 km), Agartala-Akhaura New Line (5 km), Jiribam-Imphal New Line (111 km) and Murkongselek-Pasighat New Line (27 km).Air Connectivity: The Ministry of Civil Aviation (MoCA) introduced the Regional Connectivity Scheme (UDAN) on October 21, 2016. The scheme follows a market-driven approach, under which the development of regional air connectivity routes is determined by market forces. Airlines evaluate demand and supply requirements for individual routes and take the lead in the process under the scheme.In the North Eastern states, Pasighat, Tezu, Hollongi, Jorhat, Lilabari, Rupsi, Tezpur, Dimapur, Shillong and Pakyong have been identified for the development and operation of RCS flights under UDAN. A total of 90 routes have been operationalised under the scheme.



Source link

Author

admin

Follow Me
Other Articles
Previous

Jensen Huang : After Jensen Huang warned ChatGPT maker OpenAI and other companies to shut down models they can’t make safe, Nvidia launches software to stop AI agents from going rogue |

Next

The night India hit back after Uri attack: 10 years since the surgical strikes set a new template

No Comment! Be the first one.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

A North Carolina land trust has saved the first 200 acres around Tuckertown Reservoir after 1,400 donors joined the campaign; another 3,800 privately owned acres remain at risk of sale and development

A North Carolina land trust has saved the first 200 acres around Tuckertown Reservoir after 1,400 donors joined the campaign; another 3,800 privately owned acres remain at risk of sale and development

September 29, 2026
A Maryland factory built in 1920 once employed thousands making furniture, food and WWII rations; after sitting vacant, it has been restored as a business hub with a new $1 million oyster center

A Maryland factory built in 1920 once employed thousands making furniture, food and WWII rations; after sitting vacant, it has been restored as a business hub with a new $1 million oyster center

September 29, 2026
Scientists in Thailand hid fruits in an opaque box; 16 Asian elephants learned to navigate it for rewards and followed it along

Scientists in Thailand hid fruits in an opaque box; 16 Asian elephants learned to navigate it for rewards and followed it along

September 29, 2026
Mohit Sharma set to join CSK as bowling coach | Cricket News

Mohit Sharma set to join CSK as bowling coach | Cricket News

September 29, 2026

About Us

We love WordPress and are here to provide you with professional-looking WordPress themes so you can take your website one step ahead. We focus on simplicity, elegant design, and clean code.

TG: Ads

About Us

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

We love WordPress and we are here to provide you with professional-looking WordPress themes so that you can take your website one step ahead. We focus on simplicity, elegant design, and clean code.

Category

  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ

Useful Links

  • ରାଜ୍ୟ
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ
  • Privacy Policy
  • Contact Us
  • About Us
  • Terms of Use
Copyright 2026 — Koshal Sambad. All rights reserved. SSWPL