Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ

Archives

  • September 2026
  • August 2026
  • July 2026

Categories

  • Uncategorized
  • ଓଡିଶା
  • ଜିଲ୍ଲା
  • ଦେଶ ବିଦେଶ
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ
Subscribe
Close

Search

ଦେଶ ବିଦେଶ

India’s first, 2 geothermal wells commissioned in Ladakh | India News

By admin
July 17, 2026 2 Min Read
0
Spread the love


India’s first, 2 geothermal wells commissioned in Ladakh

SRINAGAR: In a major step towards India’s clean energy mission, Lieutenant Governor of Ladakh V K Saxena Friday commissioned the country’s first and the deepest geothermal wells at Puga valley. ONGC Energy Centre would execute two geothermal wells in the Union Territory.“What has been achieved in Puga valley would serve as a blueprint for India‘s net-zero journey and significantly contribute towards making Ladakh a carbon-neutral and environmentally sustainable region,” Saxena said.The commissioning of the two 1,000m-deep wells, at an altitude of over 14,000 ft, would significantly advance Ladakh’s journey towards becoming a clean energy hub, officials said. The two geothermal wells are critical for the successful implementation of the 1MW pilot geothermal power project at Puga, which will be India’s first demonstration-scale geothermal power project, the officials added.Project engineers said that successful completion of the two wells would facilitate critical reservoir evaluation, power plant planning, and the eventual commercial development of geothermal resources in Ladakh.They said that the maximum temperature of 135° celsius was recorded at the depth of 400m. Further testing is on and they are hopeful to achieve even higher temperatures for operation of the 1MW pilot geothermal power project and eventual commercial exploration of geothermal energy.The engineers said that despite encountering geothermal activities, complex subsurface conditions, and operational challenges, the first of the two wells was successfully drilled to its target depth of 1,000m on May 22, 2026. Subsequently, the other geothermal well was spudded on June 3 and in a record time of just over a month, it was successfully drilled and completed to 1,000m depth on July 8.The geothermal power project had suffered a major setback following the expiry of the earlier tripartite MoU between the Ladakh administration, the Ladakh Autonomous Hill Development Council-Leh and the ONGC Energy Centre, resulting in critical delays of several months in project execution.Saxena then intervened to facilitate the renewal of the MoU for another five years, following which works resumed, officials said.



Source link

Author

admin

Follow Me
Other Articles
Previous

UK court denies bail to Indian captain of sanctioned Russian oil vessel

Next

Horoscope Today: Daily astrological predictions for July 18, 2026

No Comment! Be the first one.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

‘Will work with India, be friends’: China ahead of PM Modi-Xi meeting in Delhi | India News

‘Will work with India, be friends’: China ahead of PM Modi-Xi meeting in Delhi | India News

September 11, 2026
California officers found 194 abandoned Dungeness crab traps off two rivers; violations wasted hundreds of crabs and brought four-year permit suspensions

California officers found 194 abandoned Dungeness crab traps off two rivers; violations wasted hundreds of crabs and brought four-year permit suspensions

September 11, 2026
A 27-year-old Tennessee diesel mechanic wanted to farm full-time; solar sites gave his sheep 400+ acres to graze, letting him quit his job and build a 300-ewe flock

A 27-year-old Tennessee diesel mechanic wanted to farm full-time; solar sites gave his sheep 400+ acres to graze, letting him quit his job and build a 300-ewe flock

September 11, 2026
In Noida’s PG belt, buildings rise nine floors where two are allowed, cables dangle at arms reach | Noida News

In Noida’s PG belt, buildings rise nine floors where two are allowed, cables dangle at arms reach | Noida News

September 11, 2026

About Us

We love WordPress and are here to provide you with professional-looking WordPress themes so you can take your website one step ahead. We focus on simplicity, elegant design, and clean code.

TG: Ads

About Us

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

We love WordPress and we are here to provide you with professional-looking WordPress themes so that you can take your website one step ahead. We focus on simplicity, elegant design, and clean code.

Category

  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ

Useful Links

  • ରାଜ୍ୟ
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ
  • Privacy Policy
  • Contact Us
  • About Us
  • Terms of Use
Copyright 2026 — Koshal Sambad. All rights reserved. SSWPL