Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ

Archives

  • September 2026
  • August 2026
  • July 2026

Categories

  • Uncategorized
  • ଓଡିଶା
  • ଜିଲ୍ଲା
  • ଦେଶ ବିଦେଶ
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ
Subscribe
Close

Search

ଦେଶ ବିଦେଶ

Semicon 2.0, Varanasi projects, rail upgrades & more: All about 7 big decisions cleared by Cabinet

By admin
July 15, 2026 3 Min Read
0
Spread the love


Semicon 2.0, Varanasi projects, rail upgrades & more: All about 7 big decisions cleared by Cabinet

The Union Cabinet on Wednesday approved seven major decisions covering infrastructure, semiconductor manufacturing, mobile phone production, fertiliser and railway projects. The package includes Semicon 2.0, the Mobile Phone Manufacturing Scheme (MPMS) and the National Investment Policy for Urea-2026, with a combined outlay of Rs 2,19,353 crore.The announcements came during a press briefing after the Cabinet and Cabinet Committee on Economic Affairs (CCEA) meeting chaired by Prime Minister Narendra Modi.Addressing the briefing, Vaishnaw said, “I am presenting before you the seven major decisions taken by the Cabinet and the Cabinet Committee on Economic Affairs (CCEA) under the chairmanship of Prime Minister Narendra Modi.”The seven major Cabinet decisions include:

  1. Infrastructure development programme for Varanasi (Kashi)
  2. Second infrastructure project for Varanasi (Kashi)
  3. Semicon 2.0 Mission
  4. Mobile Phone Manufacturing Scheme
  5. National investment policy for urea
  6. Track doubling of Paradeep-Haridaspur railway line
  7. Fourth railway line between Dangoaposi and Rajkharsawan

The first two Cabinet decisions relate to major infrastructure projects in Varanasi aimed at developing the city. The cabinet has approved the construction of a 46.039-km link corridor connecting National Highway-19 (NH-19) with the Varanasi Ring Road. The project, aimed at easing traffic congestion in Varanasi, will also provide connectivity along the Ganga riverbank.The corridor will feature a six-lane elevated carriageway, an iconic cable-stayed bridge, an extradosed foot over bridge-cum-major bridge, along with loops, ramps, link roads and service roads. It will be developed under the Hybrid Annuity Model (HAM) at a total cost of Rs 14,447.64 crore, including Rs 6,037.85 crore for civil construction (excluding GST and including utility shifting) and Rs 541.11 crore towards land acquisition under NH(O).Announcing these decisions the minister said, “The first two decisions relate to a programme for developing infrastructure in Varanasi (Kashi) in a completely new way. The third, fourth, and fifth decisions relate to the Semicon 2.0 Mission (Semiconductor 2.0 Mission), which was approved today.”The IT minister further added that the Cabinet approved the second edition of the India Semiconductor Mission, or Semicon 2.0 Mission, with an outlay of Rs 1.27 lakh crore. Alongside, the chip push, minister Vaishnaw also announced extention of the Mobile PLI scheme, with Rs 62,500 crore laid out for its second edition.Vaishnaw further said, “The fourth decision is the approval of the Mobile Phone Manufacturing Scheme. The fifth decision is aimed at making India self-reliant in urea, for which the National Investment Policy for Urea was approved today. The sixth and seventh decisions relate to proposals for the upgradation of the railway network, including track doubling and the construction of a fourth railway line.” Cabinet approved National Investment Policy for urea, under which 9 new urea plants will be set up. The initiative will help achieve 1 crore additional urea requirement, to help India become self-reliant in urea demand.The cabinet gave green signal for the construction of a 6-/4-lane elevated corridor along the Varuna riverbank in Uttar Pradesh. The project, to be executed under the Hybrid Annuity Model, includes ramps and loops and will be built at a total capital cost of Rs 10,998.32 crore.On the railway infrastructure front, Cabinet approved two projects. Minister Vaishnaw announced doubling the Paradeep-Haridaspur railway line at a cost of Rs 2,542 crore and fourth railway line between Dangoaposi and Rajkharsawan, involving an investment of Rs 1,365 crore.



Source link

Author

admin

Follow Me
Other Articles
Previous

Delhi HC seeks government’s response on plea seeking medical intervention for Sonam Wangchuk | India News

Next

ICC introduces ‘Super Series’ and ‘Super 7’ format for 2027 ODI World Cup | Cricket News

No Comment! Be the first one.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Bianca Belair’s inspiring family story: How WWE’s EST overcame adversity, embraced her roots and built an angel family legacy beyond wrestling | WWE News

Bianca Belair’s inspiring family story: How WWE’s EST overcame adversity, embraced her roots and built an angel family legacy beyond wrestling | WWE News

September 8, 2026
Princeton put AI in charge of a fusion-plasma control loop running every 20 milliseconds; in one test it predicted a damaging instability 200 ms early and stopped it before it began

Princeton put AI in charge of a fusion-plasma control loop running every 20 milliseconds; in one test it predicted a damaging instability 200 ms early and stopped it before it began

September 8, 2026
After losing about 140.5 billion tons of ice a year for two decades, Antarctica temporarily reversed course, gaining a record 695 billion tons in 2021-23 as tropical warmth drove heavy snowfall

After losing about 140.5 billion tons of ice a year for two decades, Antarctica temporarily reversed course, gaining a record 695 billion tons in 2021-23 as tropical warmth drove heavy snowfall

September 8, 2026
“He’s gonna tear his ACL again”: Patrick Mahomes faces fresh injury concerns ahead of the new season as he prepares to make a comeback | NFL News

“He’s gonna tear his ACL again”: Patrick Mahomes faces fresh injury concerns ahead of the new season as he prepares to make a comeback | NFL News

September 8, 2026

About Us

We love WordPress and are here to provide you with professional-looking WordPress themes so you can take your website one step ahead. We focus on simplicity, elegant design, and clean code.

TG: Ads

About Us

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

We love WordPress and we are here to provide you with professional-looking WordPress themes so that you can take your website one step ahead. We focus on simplicity, elegant design, and clean code.

Category

  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ

Useful Links

  • ରାଜ୍ୟ
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ
  • Privacy Policy
  • Contact Us
  • About Us
  • Terms of Use
Copyright 2026 — Koshal Sambad. All rights reserved. SSWPL