Skip to content
-
Subscribe to our newsletter & never miss our best posts. Subscribe Now!
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ

Archives

  • August 2026
  • July 2026

Categories

  • Uncategorized
  • ଓଡିଶା
  • ଜିଲ୍ଲା
  • ଦେଶ ବିଦେଶ
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ
Subscribe
Close

Search

ଦେଶ ବିଦେଶ

In a first, grid power on way to 12 remote villages near border with China

By admin
August 15, 2026 2 Min Read
0
Spread the love


In a first, grid power on way to 12 remote villages near border with China
UPCL began laying power lines on Jan 26 this year in the Johar Valley

PITHORAGARH: For the first time since Independence, grid electricity is set to reach 12 remote migratory villages in Uttarakhand’s Johar Valley near the India-China border. Residents and ITBP personnel stationed in the high-altitude region, who relied on kerosene lamps, solar lanterns and small diesel generators for nearly eight decades, will soon have access to grid power.Uttarakhand Power Corporation Ltd (UPCL) has laid a 12km power line up to Rasgadi, located around 50km from the border by road and 17km by air, with nearby Bugdiyar also expected to be electrified soon. The two migratory villages have a combined seasonal population of around 180, with residents moving to lower valleys during winter and returning in summer.Villagers use solar lanterns at night. Some families have solar lights, while others depend on small diesel generators, but these are insufficient,” resident Ram Singh said. “Kerosene was used until a few years ago, but it is no longer available.”Bugdiyar also has an ITBP camp where personnel rely on solar power, Singh added. The Rs 21-crore electrification project spans 61km and will cover villages including Milam, Laspa, Martoli, Bilju, Burfu, Mapa, Tola, Ganghar, Panchu and Railkot.“UPCL began laying power lines on Jan 26 this year and plans to connect all 12 villages by March next year,” said DD Pangti, executive engineer of the corporation’s works division. “The project will benefit not only villagers but also ITBP personnel stationed in the area,” he added. He said UPCL had planned to electrify Rasgadi and Bugdiyar on Aug 15 after completing the required tests, however, a landslide on July 30 uprooted eight electricity poles, delaying the rollout.Residents expressed hope that the development will open new opportunities in the valley. “We have been demanding electricity in Upper Johar Valley for a long time. We hope the project, along with road connectivity, will help put the region on the tourist map,” said Shriram Singh Dharmshaktu, president of Malla Johar Vikas Samiti.



Source link

Author

admin

Follow Me
Other Articles
Previous

PM Modi puts women’s quota back on table, makes fresh pitch to opposition

Next

At BCI helm for 14 years, Manan Kumar Mishra faces heat over professional conduct

No Comment! Be the first one.

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Couple in their 70s buy abandoned 160-year-old Cotswolds church for £175,000 as retirement project after leaving London, spend £370,000 renovating and now it’s worth £700,000

Couple in their 70s buy abandoned 160-year-old Cotswolds church for £175,000 as retirement project after leaving London, spend £370,000 renovating and now it’s worth £700,000

August 17, 2026
In 1988, an English farmer stopped cultivating his entire 377-acre wheat farm; 35 years later, it became one of central England’s biggest refuges for scrub, woodland and rare wildlife

In 1988, an English farmer stopped cultivating his entire 377-acre wheat farm; 35 years later, it became one of central England’s biggest refuges for scrub, woodland and rare wildlife

August 17, 2026
Indonesia hit by 5.7 magnitude quake days after deadly 7.7 tremor

Indonesia hit by 5.7 magnitude quake days after deadly 7.7 tremor

August 17, 2026
At 15, Lynne Cox broke the English Channel record for men and women; at 30, after an 11-year wait for permission, she swam through 38°F water from Alaska to the Soviet Union

At 15, Lynne Cox broke the English Channel record for men and women; at 30, after an 11-year wait for permission, she swam through 38°F water from Alaska to the Soviet Union

August 17, 2026

About Us

We love WordPress and are here to provide you with professional-looking WordPress themes so you can take your website one step ahead. We focus on simplicity, elegant design, and clean code.

TG: Ads

About Us

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua.

We love WordPress and we are here to provide you with professional-looking WordPress themes so that you can take your website one step ahead. We focus on simplicity, elegant design, and clean code.

Category

  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ରାଜ୍ୟ
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ

Useful Links

  • ରାଜ୍ୟ
  • ଦେଶ ବିଦେଶ
  • ଜିଲ୍ଲା
  • ଓଡିଶା
  • ରାଜନୀତି
  • ଅର୍ଥନୀତି
  • ବାଣିଜ୍ୟ
  • ଅପରାଧ
  • ଖେଳ
  • Privacy Policy
  • Contact Us
  • About Us
  • Terms of Use
Copyright 2026 — Koshal Sambad. All rights reserved. SSWPL