{"id":34416,"date":"2026-10-09T07:41:11","date_gmt":"2026-10-09T07:41:11","guid":{"rendered":"https:\/\/koshalsambada.in\/?p=34416"},"modified":"2026-10-09T07:41:11","modified_gmt":"2026-10-09T07:41:11","slug":"passenger-trains-being-run-with-slower-freight-engines-as-indian-railways-faces-locomotives-shortage-records-show-80-100-cases-a-month-causing-delays-of-several-hours","status":"publish","type":"post","link":"https:\/\/koshalsambada.in\/?p=34416","title":{"rendered":"Passenger trains being run with slower freight engines as Indian Railways faces locomotives shortage; records show 80-100 cases a month causing delays of several hours"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div>\n<div class=\"e9jwa\">\n<div class=\"vdo_embedd\">\n<div class=\"GfdvZ\">\n<section class=\"_bIDB  clearfix id-r-component leadmedia undefined undefined  E9tg9 \" style=\"top:0px\">\n<div class=\"_bIDB\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">\n<div class=\"ypVvZ\">\n<div class=\"WGttI\"><img src=\"https:\/\/static.toiimg.com\/thumb\/msid-134820305,imgsize-335090,width-400,height-225,resizemode-4\/indian-railways.jpg\" alt=\"Passenger trains being run with slower freight engines as Indian Railways faces locomotives shortage; records show 80-100 cases a month causing delays of several hours\" title=\"Data for September 2026 show that Indian Railways has approximately 17,900 locomotives in its fleet. (File photo of Indian Railways train)\" decoding=\"async\" fetchpriority=\"high\"\/><\/div>\n<\/div>\n<\/div>\n<div class=\"Ta7d_ img_cptn\"><span title=\"Data for September 2026 show that Indian Railways has approximately 17,900 locomotives in its fleet. (File photo of Indian Railways train)\">Data for September 2026 show that Indian Railways has approximately 17,900 locomotives in its fleet. (File photo of Indian Railways train)<\/span><\/div>\n<\/section>\n<\/div><\/div>\n<\/div>\n<p><a href=\"https:\/\/timesofindia.indiatimes.com\/topic\/indian-railways\" styleobj=\"[object Object]\" class=\"\" commonstate=\"[object Object]\" frmappuse=\"1\" target=\"_blank\" rel=\"noopener\">Indian Railways<\/a> seems to be running short of locomotives to run its passenger trains, prompting the national transporter to make use of locos for freight trains. A shortage of locomotives meant for passenger services has forced Indian Railways to deploy slower freight engines on passenger trains, resulting in delays running into several hours, according to railway records.<span class=\"id-r-component br\" data-pos=\"3\"\/>The Railway Ministry, however, said it was accelerating efforts to expand locomotive production. It has approved 492 passenger locomotives for 2026-27 and another 187 for 2027-28, taking the total to 679 over the two financial years.<span class=\"id-r-component br\" data-pos=\"5\"\/>\u201cThe 2026-27 programme includes 326 WAP-7 locomotives and 166 WAP-7 locos. Besides these productions in the pipeline, there is a rapid adoption of modern trainsets and improvement in utilisation of existing assets,\u201d a senior official from the Ministry told PTI.<span class=\"id-r-component br\" data-pos=\"9\"\/>The official added that train operations had expanded manifold over the past 12 years, and Indian Railways was making every effort to provide a safe and comfortable journey to passengers across all categories.<span class=\"id-r-component br\" data-pos=\"11\"\/>Also Read | <a href=\"https:\/\/timesofindia.indiatimes.com\/business\/india-business\/delhi-varanasi-in-less-than-4-hours-mumbai-pune-in-48-minutes-chennai-bengaluru-in-over-1-hour-indian-railways-bets-on-seven-new-bullet-train-corridors-in-rs-16-lakh-crore-high-speed-push\/articleshow\/134783546.cms\" styleobj=\"[object Object]\" class=\"\" commonstate=\"[object Object]\" frmappuse=\"1\" target=\"_blank\" rel=\"noopener\">Delhi-Varanasi in less than 4 hours, Mumbai-Pune in 48 minutes, Chennai-Bengaluru in over 1 hour: Indian Railways bets on seven new bullet train corridors in Rs 16 lakh crore high-speed push<\/a><span class=\"id-r-component br\" data-pos=\"14\"\/><\/p>\n<p><h2>Delays of several hours<\/h2>\n<\/p>\n<p>Railway records quoted in the PTI report contain several instances in which a lack of locomotives designed for passenger services led to trains being hauled by freight engines, which operate at lower speeds. The use of these locomotives has affected running times and caused operational delays, the records show.<span class=\"id-r-component br\" data-pos=\"19\"\/>Officials confirmed that railway zones across the country report an average of 80 to 100 such incidents every month.<span class=\"id-r-component br\" data-pos=\"21\"\/>One recent case involved Train No. 11044, the Ballia-Dadar Central Express, whose operations were disrupted on September 3, 2026, for 5 hours and 28 minutes because the required passenger locomotive was unavailable, according to railway records.<span class=\"id-r-component br\" data-pos=\"24\"\/>The train was scheduled to operate with a WAP-4 passenger locomotive, capable of running at speeds exceeding 130 kmph. However, North Eastern Railway arranged a freight locomotive certified for speeds of up to 100 kmph because a suitable passenger engine was not available.<span class=\"id-r-component br\" data-pos=\"26\"\/>\u201cThe train subsequently suffered loss on run in the Bina\u2013Khandwa section between 13:26 hrs and 00:59 hrs. The incident resulted in a recorded detention of 328 minutes (5 hours 28 minutes),\u201d sources told PTI.<span class=\"id-r-component br\" data-pos=\"29\"\/>Also Read | <a href=\"https:\/\/timesofindia.indiatimes.com\/business\/india-business\/second-vande-bharat-sleeper-set-to-launch-this-month-between-bengaluru-and-mumbai-cutting-travel-time-from-24-hours-to-under-16-hours-30-year-wait-for-faster-connectivity-between-two-cities-to-end\/articleshow\/134688702.cms\" styleobj=\"[object Object]\" class=\"\" commonstate=\"[object Object]\" frmappuse=\"1\" target=\"_blank\" rel=\"noopener\">Second Vande Bharat sleeper set to launch this month between Bengaluru and Mumbai; cutting travel time from 24 hours to under 16 hours, 30 year wait for faster connectivity between two cities to end<\/a><span class=\"id-r-component br\" data-pos=\"32\"\/><\/p>\n<p><h2>Indian Railways\u2019 locomotives fleet<\/h2>\n<\/p>\n<p>Data for September 2026 show that Indian Railways has approximately 17,900 locomotives in its fleet. Of these, around 13,700 are electric engines, while roughly 4,200 run on diesel.<span class=\"id-r-component br\" data-pos=\"35\"\/>Of the approximately 13,700 electric locomotives in Indian Railways&#8217; fleet, around 3,400 are passenger engines belonging to different variants of the broad-gauge AC electric WAP series. The remaining locomotives are from the WAG series, designed primarily for freight services and associated operational requirements.<span class=\"id-r-component br\" data-pos=\"38\"\/>Among the 4,200 diesel locomotives, 284 are deployed for passenger services. Most of the others are used for freight transportation, shunting, departmental work and other duties.<span class=\"id-r-component br\" data-pos=\"40\"\/>Indian Railways data show that its locomotive fleet comprised 10,456 engines in 2013-14, including 5,633 diesel and 4,823 electric locomotives. Of the electric engines, 1,371 were passenger locomotives. However, the data for that financial year do not specify the total number of diesel locomotives used for passenger services.<span class=\"id-r-component br\" data-pos=\"43\"\/>Railway officials said the expansion of electrification from 2014 onwards gradually slowed diesel locomotive production, while manufacturing of electric engines gathered pace.<span class=\"id-r-component br\" data-pos=\"45\"\/>Instances of freight locomotives being deployed on passenger trains have been reported across almost every railway zone in the country.<span class=\"id-r-component br\" data-pos=\"47\"\/>On September 21, 2026, records showed that at least two passenger trains were operating with WAG-9 freight locomotives, which have a maximum running capacity of 100 kmph. <!-- -->The substitution was necessary because passenger locomotives capable of running at higher speeds were unavailable.<span class=\"id-r-component br\" data-pos=\"51\"\/>In one such case, Train No. 14102, the Kanpur Central-Prayagraj Sangam InterCity Express, was assigned a WAG-9 freight locomotive with a running capacity of 100 kmph.<span class=\"id-r-component br\" data-pos=\"53\"\/>According to sources, the train was scheduled to run with a WAP-1 passenger locomotive, which can operate at speeds of up to 130 kmph.<span class=\"id-r-component br\" data-pos=\"56\"\/>\u201cDue to shortage of passenger locomotives, the rail administration has to substitute it with freight engines. This led to a delay of at least 30 minutes as the train operated at 100 kmph in sections where the speed permission was 130,\u201d a railway source said.<span class=\"id-r-component br\" data-pos=\"59\"\/>A second incident recorded on the same day highlighted similar operational difficulties arising from the use of freight engines on passenger services.<span class=\"id-r-component br\" data-pos=\"61\"\/>Train No. 17601, which operates between Kacheguda in Telangana and Shri Ganganagar in Rajasthan, was assigned a WAG-9 freight locomotive instead of its scheduled WAP-7 passenger engine because of a shortage. <!-- -->The substitution resulted in a detention and affected the train&#8217;s overall punctuality.<span class=\"id-r-component br\" data-pos=\"65\"\/>\u201cThe production of locomotives has increased manifold in the last 12 years. However, years of neglect of several crucial manufacturing activities before 2014, which caused a severe shortage of locomotives, wagons and coaches, will be compensated in due course of time,\u201d a senior zonal railway official said.<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/timesofindia.indiatimes.com\/business\/india-business\/passenger-trains-being-run-with-slower-freight-engines-as-indian-railways-faces-locomotives-shortage-records-show-80-100-cases-a-month-causing-delays-of-several-hours\/articleshow\/134813298.cms\" target=\"_blank\" rel=\"noopener\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Data for September 2026 show that Indian Railways has approximately 17,900 locomotives in its fleet. (File photo of Indian Railways train) Indian Railways seems to be running short of locomotives to run its passenger trains, prompting the national transporter to make use of locos for freight trains. A shortage of locomotives meant for passenger services [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":34417,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[],"class_list":["post-34416","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-31"],"magazineBlocksPostFeaturedMedia":{"thumbnail":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg","medium":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg","medium_large":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg","large":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg","1536x1536":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg","2048x2048":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg","blogsy-small":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg","blogsy-small-tall":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg","blogsy-small-square":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg","blogsy-small-masonry":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg","blogsy-medium":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg","blogsy-medium-masonry":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg","blogsy-large":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg","blogsy-wide":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg"},"magazineBlocksPostAuthor":{"name":"admin","avatar":"https:\/\/secure.gravatar.com\/avatar\/8709732a479614e7a8aa24d3eb1b239f30dc6d90c61464ed495001e7a469d856?s=96&d=mm&r=g"},"magazineBlocksPostCommentsNumber":"0","magazineBlocksPostExcerpt":"Data for September 2026 show that Indian Railways has approximately 17,900 locomotives in its fleet. (File photo of Indian Railways train) Indian Railways seems to be running short of locomotives to run its passenger trains, prompting the national transporter to make use of locos for freight trains. A shortage of locomotives meant for passenger services [&hellip;]","magazineBlocksPostCategories":["\u0b26\u0b47\u0b36 \u0b2c\u0b3f\u0b26\u0b47\u0b36"],"magazineBlocksPostViewCount":1,"magazineBlocksPostReadTime":5,"magazine_blocks_featured_image_url":{"full":["https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg",400,225,false],"medium":["https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg",300,169,false],"thumbnail":["https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/10\/indian-railways.jpg",150,84,false]},"magazine_blocks_author":{"display_name":"admin","author_link":"https:\/\/koshalsambada.in\/author\/admin"},"magazine_blocks_comment":0,"magazine_blocks_author_image":"https:\/\/secure.gravatar.com\/avatar\/8709732a479614e7a8aa24d3eb1b239f30dc6d90c61464ed495001e7a469d856?s=96&d=mm&r=g","magazine_blocks_category":"<a href=\"#\" class=\"category-link category-link-31\">\u0b26\u0b47\u0b36 \u0b2c\u0b3f\u0b26\u0b47\u0b36<\/a>","_links":{"self":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/posts\/34416","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=34416"}],"version-history":[{"count":0,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/posts\/34416\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/media\/34417"}],"wp:attachment":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=34416"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=34416"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=34416"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}