{"id":17207,"date":"2026-08-27T12:38:12","date_gmt":"2026-08-27T12:38:12","guid":{"rendered":"https:\/\/koshalsambada.in\/?p=17207"},"modified":"2026-08-27T12:38:12","modified_gmt":"2026-08-27T12:38:12","slug":"railway-station-modernization-from-e-coli-to-amenity-gaps-what-cag-found-beyond-the-railway-makeover-india-news","status":"publish","type":"post","link":"https:\/\/koshalsambada.in\/?p=17207","title":{"rendered":"Railway Station Modernization: From E coli to amenity gaps: What CAG found beyond the railway makeover | India News"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div>\n<div class=\"e9jwa\">\n<div class=\"vdo_embedd\">\n<div class=\"GfdvZ\">\n<section class=\"_bIDB  clearfix id-r-component leadmedia undefined undefined  E9tg9 \" style=\"top:0px\">\n<div class=\"_bIDB\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">\n<div class=\"ypVvZ\">\n<div class=\"WGttI\"><img src=\"https:\/\/static.toiimg.com\/thumb\/msid-133563081,imgsize-1573737,width-400,height-225,resizemode-4\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg\" alt=\"From E coli to amenity gaps: What CAG found beyond the railway makeover\" title=\"Vande Bharat to E. coli: What CAG found behind Indian Railways\u2019 big makeover (PTI file photo)\" decoding=\"async\" fetchpriority=\"high\"\/><\/div>\n<\/div>\n<\/div>\n<div class=\"Ta7d_ img_cptn\"><span title=\"Vande Bharat to E. coli: What CAG found behind Indian Railways\u2019 big makeover (PTI file photo)\">Vande Bharat to E. coli: What CAG found behind Indian Railways\u2019 big makeover (PTI file photo)<\/span><\/div>\n<\/section>\n<\/div><\/div>\n<\/div>\n<p>NEW DELHI: <a href=\"https:\/\/timesofindia.indiatimes.com\/topic\/indian-railways\" styleobj=\"[object Object]\" class=\"\" commonstate=\"[object Object]\" frmappuse=\"1\" target=\"_blank\" rel=\"noopener\">Indian Railways<\/a> is in the middle of one of its biggest modernisation drives, spanning station redevelopment, new trains, electrification and record capital investment. A recent CAG audit, however, shows that alongside this expansion, gaps remain in some of the most basic passenger amenities at stations.<span class=\"id-r-component br\" data-pos=\"4\"\/>For years now, the story of Indian Railways has been told through images of transformation.<span class=\"id-r-component br\" data-pos=\"6\"\/>There are sleek Vande Bharat trains gliding out of revamped stations, glossy artist&#8217;s impressions of redeveloped railway hubs, new concourses, lifts, escalators and futuristic terminals. The government has steadily raised capital expenditure on the national transporter, presenting the Railways as one of the central pillars of country&#8217;s infrastructure push.<span class=\"id-r-component br\" data-pos=\"10\"\/>The makeover is visible. But the latest audit findings of the Comptroller and Auditor General of India show that ensuring basic passenger amenities remain available and functional across the network continues to be an important part of that transformation.<span class=\"id-r-component br\" data-pos=\"12\"\/>In a report tabled in Parliament on August 12, the CAG examined passenger amenities and sanitation at non-suburban railway stations and found significant gaps in the basics. Of 512 stations covered by the audit, 458 had deficiencies in one or more essential passenger amenities. Water samples collected from coolers at eight stations were found contaminated with E. coli, a marker that raises serious concerns about faecal contamination and water safety.<span class=\"id-r-component br\" data-pos=\"16\"\/><\/p>\n<div data-pos=\"0\" class=\"id-r-component iIpbx undefined  &#10;        \">\n<div><img decoding=\"async\" alt=\"Deficiencies found in CAG report\" msid=\"133563163\" imgsize=\"170295\" resizemode=\"4\" width=\"\" title=\"Amenities gap at railway stations (Source: CAG)\" placeholdersrc=\"https:\/\/static.toiimg.com\/photo\/83033472.cms\" offsetvertical=\"0\" placeholdermsid=\"47529300\" type=\"thumb\" class=\"\" src=\"https:\/\/static.toiimg.com\/photo\/imgsize-170295,msid-133563163\/deficiencies-found-in-cag-report.jpg\" data-api-prerender=\"true\"\/><\/p>\n<p>Amenities gap at railway stations (Source: CAG)<\/p>\n<\/div>\n<\/div>\n<p><span class=\"id-r-component br\" data-pos=\"18\"\/>The latest CAG reports, including those on passenger amenities, railway finances and compliance, raise a larger question about the makeover that we keep talking about: Is the transformation merely about building new assets, or is it also about making the everyday railway experience safer, cleaner, more reliable and financially sustainable?<span class=\"id-r-component br\" data-pos=\"20\"\/><\/p>\n<p><h2>What the CAG found at railway stations<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"22\"\/>Indian Railways is not a conventional transport system. <!-- -->It is the daily infrastructure of a country on the move.<span class=\"id-r-component br\" data-pos=\"26\"\/>Millions pass through its stations not as occasional tourists but as workers, students, migrants, families and small traders. For many, the railway journey begins long before boarding a train. It begins with finding the platform, locating a toilet, getting drinking water, sitting in a waiting area and navigating a crowded station.<span class=\"id-r-component br\" data-pos=\"28\"\/>That is precisely where the latest audit becomes very important.<span class=\"id-r-component br\" data-pos=\"31\"\/>The CAG&#8217;s Report No. 31 of 2026, focused on passenger amenities and sanitation at non-suburban railway stations, was tabled on August 12.<span class=\"id-r-component br\" data-pos=\"33\"\/>The findings suggest that while major infrastructure projects may dominate the narrative around railway modernisation, there continues to be significant variation in the availability of basic passenger amenities across the stations examined.<span class=\"id-r-component br\" data-pos=\"35\"\/>The audit found deficiencies at nearly nine out of every 10 stations examined.<span class=\"id-r-component br\" data-pos=\"38\"\/>The gaps ranged across basic amenities such as toilets, urinals and drinking-water facilities. In other words, the issue was not necessarily the absence of a grand redevelopment plan. It was ensuring that facilities passengers encounter every day are available and functional consistently.<span class=\"id-r-component br\" data-pos=\"40\"\/>The audit underlines that station modernisation has two components: creating new infrastructure and ensuring that routine passenger amenities remain available and functional.<span class=\"id-r-component br\" data-pos=\"43\"\/><\/p>\n<p><h2><keyword id=\"28058104\" type=\"Denny\" weightage=\"20\" keywordseo=\"water-quality\" source=\"keywords\">Water quality<\/keyword> emerges as a key concern<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"45\"\/>Perhaps the most striking finding in the audit concerns drinking water.<span class=\"id-r-component br\" data-pos=\"47\"\/>The CAG found E. coli contamination in samples collected from water coolers at eight locations. The presence of such bacteria raises concerns because contaminated drinking water can pose a serious public-health risk.<span class=\"id-r-component br\" data-pos=\"49\"\/>The finding was particularly important because access to safe water is among the most basic services expected at a railway station.<span class=\"id-r-component br\" data-pos=\"52\"\/>The finding has now prompted a special response from Indian Railways.<span class=\"id-r-component br\" data-pos=\"54\"\/>The Railways has launched a special drive to clean and disinfect drinking-water tanks and filters. Zonal Railways have also been advised to undertake comprehensive inspections of drinking-water infrastructure and rectify deficiencies wherever they are found.<span class=\"id-r-component br\" data-pos=\"56\"\/>Importantly, the exercise is not being limited to a one-time cleaning drive. The Railways has directed that station-wise deficiencies and the action taken to address them be monitored.<span class=\"id-r-component br\" data-pos=\"59\"\/>That changes the nature of the response.<span class=\"id-r-component br\" data-pos=\"61\"\/>The issue is no longer simply whether a station has a drinking-water facility. The bigger question is whether the entire system behind that facility, tanks, filters, pipelines, coolers and monitoring, is functioning properly and delivering safe water consistently.<span class=\"id-r-component br\" data-pos=\"63\"\/>It is a crucial distinction.<span class=\"id-r-component br\" data-pos=\"65\"\/>A water cooler installed at a station is an infrastructure achievement. Ensuring that the water remains safe every day is a maintenance and governance challenge.<span class=\"id-r-component br\" data-pos=\"68\"\/>The new cleaning and inspection drive also underlines the broader problem identified by the CAG.<span class=\"id-r-component br\" data-pos=\"70\"\/>Modernisation is not simply about creating infrastructure. It is about maintaining it.<span class=\"id-r-component br\" data-pos=\"72\"\/>A water cooler installed at a station is only as useful as the quality of the water flowing through it. A new toilet is only as useful as its cleanliness and upkeep. An escalator that frequently stops working or a waiting hall that is not maintained does not become useful merely because the infrastructure exists.<span class=\"id-r-component br\" data-pos=\"75\"\/>The challenge for Indian Railways is increasingly shifting from construction to maintenance.<span class=\"id-r-component br\" data-pos=\"77\"\/><\/p>\n<p><h2>The missing link in the makeover<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"79\"\/>India&#8217;s railway modernisation programme has been built around large numbers.<span class=\"id-r-component br\" data-pos=\"81\"\/>New lines, doubling and electrification projects, station redevelopment, signalling upgrades and new rolling stock have become the visible markers of the transformation.<span class=\"id-r-component br\" data-pos=\"83\"\/>The latest financial audit, Report No. 30 of 2026, was also tabled on August 12 and examines the finances of the ministry of Railways for the year ended March 2025. <!-- -->Its significance lies in placing the makeover against the larger question of financial capacity and the resources available to sustain such an ambitious transformation.<span class=\"id-r-component br\" data-pos=\"87\"\/>The numbers show the scale of the continuing investment push. For 2026-27, railway capital expenditure is budgeted at Rs 2.93 lakh crore, with budgetary support from the Centre expected to finance around 95% of that spending.<span class=\"id-r-component br\" data-pos=\"89\"\/>This represents a fundamental shift in how railway modernisation is being financed.<span class=\"id-r-component br\" data-pos=\"92\"\/>The network is no longer relying only on internally generated resources to fund its massive expansion and upgrade plans. Government support has become the financial backbone of the capital programme.<span class=\"id-r-component br\" data-pos=\"94\"\/>That has enabled Indian Railways to build faster. At the same time, the growing asset base makes maintenance, upgrade and efficient operation increasingly important.<span class=\"id-r-component br\" data-pos=\"96\"\/><\/p>\n<div data-pos=\"0\" class=\"id-r-component iIpbx undefined  &#10;        \">\n<div><img decoding=\"async\" alt=\"98.4% operating ratio, record capex: What\u2019s weighing on Indian Railways\" msid=\"133563244\" imgsize=\"196380\" resizemode=\"4\" width=\"\" title=\"Record spending, 98.4% operating ratio\" placeholdersrc=\"https:\/\/static.toiimg.com\/photo\/83033472.cms\" offsetvertical=\"0\" placeholdermsid=\"47529300\" type=\"thumb\" class=\"\" src=\"https:\/\/static.toiimg.com\/photo\/imgsize-196380,msid-133563244\/98-4-operating-ratio-record-capex-whats-weighing-on-indian-railways.jpg\" data-api-prerender=\"true\"\/><\/p>\n<p>Record spending, 98.4% operating ratio<\/p>\n<\/div>\n<\/div>\n<p><span class=\"id-r-component br\" data-pos=\"98\"\/>The answer lies partly in the operating ratio, a measure of how much of every rupee earned is consumed by working expenses. <!-- -->A lower operating ratio leaves more room for investment and financial flexibility.<span class=\"id-r-component br\" data-pos=\"102\"\/>For 2026-27, the operating ratio is budgeted at 98.4%, after a revised estimate of 98.8% for 2025-26, as reported by Parliament and PRS Legislative Research.<span class=\"id-r-component br\" data-pos=\"104\"\/>The margin remains narrow.<span class=\"id-r-component br\" data-pos=\"106\"\/>The modernisation drive is also being supported by a substantial increase in central budgetary support. Government support is expected to finance around 95% of railway capital expenditure in 2026-27, while the operating ratio remains above 98%.<span class=\"id-r-component br\" data-pos=\"109\"\/><\/p>\n<p><h2>Building big, maintaining better<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"111\"\/>The CAG&#8217;s findings bring an old problem into a new context.<span class=\"id-r-component br\" data-pos=\"113\"\/>The audit places renewed focus on maintenance, an increasingly important issue as the Railways adds and upgrades infrastructure across a very large network.<span class=\"id-r-component br\" data-pos=\"115\"\/>The transformation of Indian Railways will not be judged only by whether a station redevelopment project is completed on schedule. It will also be judged years later by whether the facilities created continue to work as intended.<span class=\"id-r-component br\" data-pos=\"118\"\/>The CAG examined precisely these everyday indicators \u2014 drinking water, toilets and urinals, seating, platform shelters, accessibility and sanitation \u2014 making the report as much about service quality as infrastructure availability.<span class=\"id-r-component br\" data-pos=\"120\"\/>The findings highlight the importance of pairing asset creation with regular maintenance, inspection and service monitoring.<span class=\"id-r-component br\" data-pos=\"122\"\/>The former is visible. It can be photographed, inaugurated and counted.<span class=\"id-r-component br\" data-pos=\"125\"\/>The latter is harder. It requires regular inspection, accountability, maintenance contracts, quality checks and systems that continue to work long after the inaugural ceremony.<span class=\"id-r-component br\" data-pos=\"127\"\/>The Railways&#8217; latest drinking-water drive points in that direction. The focus on comprehensive inspection, rectification and station-wise monitoring suggests an attempt to make maintenance more systematic rather than waiting for individual problems to surface.<span class=\"id-r-component br\" data-pos=\"130\"\/>The real test will be whether that monitoring continues after the immediate response to the audit findings.<span class=\"id-r-component br\" data-pos=\"132\"\/>The challenge of maintaining standards across a vast network<span class=\"id-r-component br\" data-pos=\"134\"\/>The latest findings also underline the challenge of ensuring uniform service standards across a railway network of India&#8217;s scale.<span class=\"id-r-component br\" data-pos=\"136\"\/>At one level are the flagship projects: High-profile trains, major stations and corridors receiving substantial investment. <!-- -->These are the symbols that shape public perception of a changing railway system.<span class=\"id-r-component br\" data-pos=\"140\"\/>At another level are hundreds of ordinary stations where the provision and upkeep of basic amenities remain equally important.<span class=\"id-r-component br\" data-pos=\"142\"\/>The CAG&#8217;s examination of 512 stations and its finding of deficiencies at 458 suggests that ensuring minimum standards consistently across the network remains a work in progress.<span class=\"id-r-component br\" data-pos=\"144\"\/>That is where the true test of the makeover lies.<span class=\"id-r-component br\" data-pos=\"147\"\/>Indian Railways is too large and too geographically diverse for transformation to be measured only through a handful of showcase projects. The success of the modernisation programme will depend on whether improvements can eventually become the standard across the network rather than remain concentrated at major stations.<span class=\"id-r-component br\" data-pos=\"149\"\/>The passenger boarding from a smaller city experiences the Railways through the condition of the local station.<span class=\"id-r-component br\" data-pos=\"152\"\/>That station is where the promise of transformation ultimately becomes visible.<span class=\"id-r-component br\" data-pos=\"154\"\/><\/p>\n<p><h2>A financial makeover still in progress<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"156\"\/>The railway modernisation programme is also taking place against a difficult financial backdrop.<span class=\"id-r-component br\" data-pos=\"158\"\/>Passenger and freight revenues remain central to the financial health of the system. Yet recent budget analysis has pointed to revenue estimates falling short of targets, even as the Railways continues to undertake large capital investments.<span class=\"id-r-component br\" data-pos=\"161\"\/>According to the 2026-27 analysis by PRS Legislative Research, freight revenue in 2025-26 was estimated to be 5.1% below the budget estimate, while passenger revenue was expected to fall short by 13.8%.<span class=\"id-r-component br\" data-pos=\"163\"\/><\/p>\n<div data-pos=\"0\" class=\"id-r-component iIpbx undefined  &#10;        \">\n<div><img decoding=\"async\" alt=\"Source: PRS\" msid=\"133563216\" imgsize=\"163060\" resizemode=\"4\" width=\"\" title=\"Freight down, passenger revenue misses target\" placeholdersrc=\"https:\/\/static.toiimg.com\/photo\/83033472.cms\" offsetvertical=\"0\" placeholdermsid=\"47529300\" type=\"thumb\" class=\"\" src=\"https:\/\/static.toiimg.com\/photo\/imgsize-163060,msid-133563216\/source-prs.jpg\" data-api-prerender=\"true\"\/><\/p>\n<p>Freight down, passenger revenue misses target<\/p>\n<\/div>\n<\/div>\n<p><span class=\"id-r-component br\" data-pos=\"165\"\/>This does not mean that the railway transformation has stalled. Far from it. The scale of capital expenditure remains historically high.<span class=\"id-r-component br\" data-pos=\"167\"\/>It does mean, however, that central budgetary support remains a major pillar of the current modernisation programme.<span class=\"id-r-component br\" data-pos=\"170\"\/>The question is whether the investments being made today will eventually create a more efficient railway system, one that can carry more freight, attract more passengers, reduce congestion and improve revenue generation.<span class=\"id-r-component br\" data-pos=\"172\"\/>That is the economic logic behind modernisation.<span class=\"id-r-component br\" data-pos=\"174\"\/>The CAG&#8217;s latest findings add another dimension: modernisation must also ensure that spending translates into reliable passenger amenities and services.<span class=\"id-r-component br\" data-pos=\"177\"\/><\/p>\n<p><h2>The real makeover begins after inauguration<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"179\"\/>There is another lesson in the CAG audit.<span class=\"id-r-component br\" data-pos=\"181\"\/>One of the most important parts of railway transformation is creating systems capable of looking after the infrastructure once it is built.<span class=\"id-r-component br\" data-pos=\"183\"\/>A station redevelopment project has a beginning and an end. A maintenance programme does not.<span class=\"id-r-component br\" data-pos=\"185\"\/>It requires continuous supervision.<span class=\"id-r-component br\" data-pos=\"187\"\/>The Railways&#8217; decision to launch a special drive for cleaning and disinfecting drinking-water tanks and filters, inspect infrastructure and monitor station-wise deficiencies is therefore significant.<span class=\"id-r-component br\" data-pos=\"190\"\/>The Railways will now have to ensure that the response goes beyond corrective action after contamination is detected. The larger goal is preventive systems, regular water testing, routine cleaning and disinfection, replacement of ageing infrastructure, clear responsibility for sanitation, and stronger monitoring of passenger amenities.<span class=\"id-r-component br\" data-pos=\"192\"\/>The same principle applies across the network.<span class=\"id-r-component br\" data-pos=\"194\"\/>Modernisation must become a process rather than an event.<span class=\"id-r-component br\" data-pos=\"197\"\/>The CAG&#8217;s findings have arrived at an important moment because Indian Railways is entering a phase where the story can no longer be told only through the scale of capital expenditure. The network has already seen major investments and ambitious announcements.<span class=\"id-r-component br\" data-pos=\"199\"\/>The next question is whether these investments are producing a railway that works better every day.<span class=\"id-r-component br\" data-pos=\"201\"\/><\/p>\n<p><h2>From showcase projects to everyday reliability<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"203\"\/>There is no doubt that Indian Railways is changing.<span class=\"id-r-component br\" data-pos=\"205\"\/>The infrastructure pipeline is enormous. Capital spending remains high. <!-- -->Stations and trains look different from what they did a decade ago. Electrification, new corridors and capacity expansion are reshaping the network.<span class=\"id-r-component br\" data-pos=\"209\"\/>The CAG audit does not erase those changes.<span class=\"id-r-component br\" data-pos=\"211\"\/>Instead, it adds another dimension to the modernisation story: the importance of ensuring that basic passenger services improve alongside major infrastructure creation.<span class=\"id-r-component br\" data-pos=\"213\"\/>A transformed railway will ultimately be judged both by its new assets and by the consistency with which its everyday facilities work.<span class=\"id-r-component br\" data-pos=\"216\"\/>It must be judged by outcomes.<span class=\"id-r-component br\" data-pos=\"218\"\/>The latest audit reports offer precisely that reminder.<span class=\"id-r-component br\" data-pos=\"220\"\/>The CAG&#8217;s passenger amenities report was tabled in Parliament on August 12, alongside the latest reports on railway finances and compliance. Together, they offer a snapshot of a system undergoing one of its most ambitious periods of investment while still grappling with persistent questions of service delivery, maintenance and financial sustainability.<span class=\"id-r-component br\" data-pos=\"223\"\/><\/p>\n<div data-pos=\"0\" class=\"id-r-component iIpbx undefined  &#10;        \">\n<div><img decoding=\"async\" alt=\"95% government backing, record capex\" msid=\"133563296\" imgsize=\"201771\" resizemode=\"4\" width=\"\" title=\"Record capex, heavy government support: The financial reality behind Railways\u2019 makeover\" placeholdersrc=\"https:\/\/static.toiimg.com\/photo\/83033472.cms\" offsetvertical=\"0\" placeholdermsid=\"47529300\" type=\"thumb\" class=\"\" src=\"https:\/\/static.toiimg.com\/photo\/imgsize-201771,msid-133563296\/95-government-backing-record-capex.jpg\" data-api-prerender=\"true\"\/><\/p>\n<p>Record capex, heavy government support: The financial reality behind Railways\u2019 makeover<\/p>\n<\/div>\n<\/div>\n<p><span class=\"id-r-component br\" data-pos=\"225\"\/>The new drinking-water drive shows that the Railways is responding to at least one of those concerns. But whether the effort translates into consistently safer and better-maintained facilities across stations will determine its real impact.<\/p>\n<div data-type=\"in_view\" class=\"  \">\n<div class=\"LEzX4\">\n<div class=\"PmOGb\">\n<p class=\"PSf84\">Share your thoughts in the comments<\/p>\n<\/div>\n<p><button type=\"button\" class=\"sUTYm \">Insightful<\/button><button type=\"button\" class=\"sUTYm \">Agree<\/button><button type=\"button\" class=\"sUTYm \">Disagree<\/button><button type=\"button\" class=\"sUTYm \">Skeptical<\/button><button type=\"button\" class=\"sUTYm \">Concerning<\/button><button type=\"button\" class=\"sUTYm \">Promising<\/button><button type=\"button\" class=\"sUTYm \">Worth Reading<\/button><button type=\"button\" class=\"sUTYm \">Big Development<\/button><\/p>\n<p><textarea class=\"T9MbS\" rows=\"1\" placeholder=\"Add your Thoughts...\"\/><button type=\"button\" class=\"ZW6JD \" disabled=\"\">Post Comment<\/button><\/p>\n<p class=\"swnca\">Be respectful \u00b7 <a href=\"https:\/\/www.indiatimes.com\/termsandcondition\" target=\"_blank\" rel=\"noopener noreferrer\" class=\"gkv0P\">TOI community guidelines<\/a><\/p>\n<\/div>\n<\/div>\n<p><span class=\"id-r-component br\" data-pos=\"228\"\/>The railway makeover, in other words, is real. But seems unfinished.<span class=\"id-r-component br\" data-pos=\"230\"\/>The CAG report does not negate the scale of the transformation underway in Indian Railways. Capital investment remains at record levels, stations are being redeveloped and capacity is expanding. <!-- -->What the audit adds to that picture is a reminder that the next phase of modernisation will also depend on maintenance, consistency and ensuring that facilities already created remain functional, accessible and safe.<span class=\"id-r-component br\" data-pos=\"234\"\/>The Railways&#8217; response to the water-quality findings, including inspections, filtration upgrades and station-wise monitoring, shows that corrective action has begun. The larger test will be whether these systems can help close the remaining amenity gaps across a network that serves millions of passengers every day.<span class=\"id-r-component br\" data-pos=\"236\"\/>For millions of passengers, transformation will ultimately mean something simple: a clean station, a functioning toilet, safe drinking water and a journey in which the infrastructure created for them continues to work as intended.<span class=\"id-r-component br\" data-pos=\"238\"\/><\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/timesofindia.indiatimes.com\/india\/from-e-coli-to-amenity-gaps-what-cag-found-beyond-the-railway-makeover\/articleshow\/133563059.cms\" target=\"_blank\" rel=\"noopener\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Vande Bharat to E. coli: What CAG found behind Indian Railways\u2019 big makeover (PTI file photo) NEW DELHI: Indian Railways is in the middle of one of its biggest modernisation drives, spanning station redevelopment, new trains, electrification and record capital investment. A recent CAG audit, however, shows that alongside this expansion, gaps remain in some [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":17208,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[],"class_list":["post-17207","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-31"],"magazineBlocksPostFeaturedMedia":{"thumbnail":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg","medium":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg","medium_large":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg","large":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg","1536x1536":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg","2048x2048":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg","blogsy-small":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg","blogsy-small-tall":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg","blogsy-small-square":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg","blogsy-small-masonry":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg","blogsy-medium":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg","blogsy-medium-masonry":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg","blogsy-large":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg","blogsy-wide":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg"},"magazineBlocksPostAuthor":{"name":"admin","avatar":"https:\/\/secure.gravatar.com\/avatar\/8709732a479614e7a8aa24d3eb1b239f30dc6d90c61464ed495001e7a469d856?s=96&d=mm&r=g"},"magazineBlocksPostCommentsNumber":"0","magazineBlocksPostExcerpt":"Vande Bharat to E. coli: What CAG found behind Indian Railways\u2019 big makeover (PTI file photo) NEW DELHI: Indian Railways is in the middle of one of its biggest modernisation drives, spanning station redevelopment, new trains, electrification and record capital investment. A recent CAG audit, however, shows that alongside this expansion, gaps remain in some [&hellip;]","magazineBlocksPostCategories":["\u0b26\u0b47\u0b36 \u0b2c\u0b3f\u0b26\u0b47\u0b36"],"magazineBlocksPostViewCount":1,"magazineBlocksPostReadTime":12,"magazine_blocks_featured_image_url":{"full":["https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg",400,225,false],"medium":["https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg",300,169,false],"thumbnail":["https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/new-trains-new-stations-old-problems-what-cag-found-in-indian-railways-audit.jpg",150,84,false]},"magazine_blocks_author":{"display_name":"admin","author_link":"https:\/\/koshalsambada.in\/author\/admin"},"magazine_blocks_comment":0,"magazine_blocks_author_image":"https:\/\/secure.gravatar.com\/avatar\/8709732a479614e7a8aa24d3eb1b239f30dc6d90c61464ed495001e7a469d856?s=96&d=mm&r=g","magazine_blocks_category":"<a href=\"#\" class=\"category-link category-link-31\">\u0b26\u0b47\u0b36 \u0b2c\u0b3f\u0b26\u0b47\u0b36<\/a>","_links":{"self":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/posts\/17207","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=17207"}],"version-history":[{"count":0,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/posts\/17207\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/media\/17208"}],"wp:attachment":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=17207"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=17207"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=17207"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}