{"id":13415,"date":"2026-08-17T16:56:49","date_gmt":"2026-08-17T16:56:49","guid":{"rendered":"https:\/\/koshalsambada.in\/?p=13415"},"modified":"2026-08-17T16:56:49","modified_gmt":"2026-08-17T16:56:49","slug":"openai-gets-nvidia-backing-for-its-ohio-datacenter-that-is-said-to-be-latest-complex-transaction-aimed-to-help-company-secure-mega-computing-capacity","status":"publish","type":"post","link":"https:\/\/koshalsambada.in\/?p=13415","title":{"rendered":"OpenAI gets Nvidia backing for its Ohio datacenter that is said to be latest complex transaction aimed to help company secure mega computing capacity"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div>\n<div class=\"e9jwa\">\n<div class=\"vdo_embedd\">\n<div class=\"GfdvZ\">\n<section class=\"_bIDB  clearfix id-r-component leadmedia undefined undefined  E9tg9 \" style=\"top:0px\">\n<div class=\"_bIDB\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">\n<div class=\"ypVvZ\">\n<div class=\"WGttI\"><img src=\"https:\/\/static.toiimg.com\/thumb\/msid-133299447,imgsize-27808,width-400,height-225,resizemode-4\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg\" alt=\"OpenAI gets Nvidia backing for its Ohio datacenter that is said to be latest complex transaction aimed to help company secure mega computing capacity\" title=\"Nvidia backs OpenAI's 8GW Ohio data centre deal with SB Energy\" decoding=\"async\" fetchpriority=\"high\"\/><\/div>\n<\/div>\n<\/div>\n<div class=\"Ta7d_ img_cptn\"><span title=\"Nvidia backs OpenAI's 8GW Ohio data centre deal with SB Energy\">Nvidia backs OpenAI&#8217;s 8GW Ohio data centre deal with SB Energy<\/span><\/div>\n<\/section>\n<\/div><\/div>\n<\/div>\n<p><a href=\"https:\/\/timesofindia.indiatimes.com\/topic\/openai\" styleobj=\"[object Object]\" class=\"\" commonstate=\"[object Object]\" frmappuse=\"1\" target=\"_blank\" rel=\"noopener\">OpenAI<\/a> has signed a 20-year lease for roughly 8 gigawatts of computing capacity in Pike County, Ohio, and Nvidia has agreed to stand behind it. The chipmaker will be the exclusive supplier of AI compute at SB Energy&#8217;s PORTS-Pike Technology Campus, invest $1.5 billion in the SoftBank-backed developer, and provide credit support for the land, power and shell of the initial 4.25 IT-gigawatt phase.<!-- --> SB Energy will build, own and operate the site. OpenAI is only the tenant.<span class=\"id-r-component br\" data-pos=\"4\"\/>The structure is the interesting part. Nvidia is backstopping the value of the finished data centre rather than OpenAI&#8217;s rent, according to The Wall Street Journal. If OpenAI walked away, SB Energy would first look for another customer at the same price, then try to sell the campus. Only after that would Nvidia cover the difference\u2014up to $105 billion once the first phase is complete. <!-- -->The guarantee covers completed buildings, not construction sites, which keeps the chipmaker&#8217;s exposure narrower than the headline number suggests.<span class=\"id-r-component br\" data-pos=\"9\"\/><\/p>\n<p><h2><b>Nvidia trimmed its exposure after a $250 billion figure spooked investors<\/b><\/h2>\n<\/p>\n<p>That ceiling has already moved once. Nvidia initially planned to guarantee all 10 gigawatts of OpenAI&#8217;s commitments upfront, which the Journal reported could have totalled around $250 billion. Nvidia shares fell 5% in late July when the discussions became public. The company is now expected to guarantee under $120 billion at the start, with an option to extend to the remaining 3.75 IT-GW.<span class=\"id-r-component br\" data-pos=\"14\"\/>Jensen Huang framed it as durable infrastructure, saying land, power and shell have become vital in the AI era. Sam Altman was blunter about scale, calling it a huge site.<span class=\"id-r-component br\" data-pos=\"16\"\/>The timing helps SB Energy. Founded in 2019, the company is working with bankers on an IPO as soon as next month, targeting $5\u20137 billion. <!-- -->Goldman Sachs and JP Morgan advised SB Energy; Morgan Stanley advised Nvidia.<span class=\"id-r-component br\" data-pos=\"20\"\/><\/p>\n<p><h2><b>What Pike County actually gets from the OpenAI data centre deal<\/b><\/h2>\n<\/p>\n<p>The campus sits partly on remediated federal land at the decommissioned Portsmouth Gaseous Diffusion Plant, a former uranium-enrichment site. OpenAI expects 35,000 construction jobs across a six-year buildout through 2032, plus 2,500 permanent operating roles. It is adding $40 million to SB Energy&#8217;s existing $40 million community fund, and separately offering 84millioninCodexcredits\u2014100 each for about 844,000 Ohio college and technical school students during the 2026-27 academic year.<span class=\"id-r-component br\" data-pos=\"25\"\/>Power is the harder problem. The first 800 megawatts arrive in 2028 using existing AEP Ohio infrastructure. Beyond that, SB Energy and SoftBank plan at least 10 GW of new generation and $4.2 billion in regional grid upgrades, with the campus leaning on a 9.2-gigawatt natural-gas plant owned by the US government and financed by Japan under a recent trade deal. The site is expected to generate enough electricity for seven million homes.<span class=\"id-r-component br\" data-pos=\"27\"\/>OpenAI says grid costs will not land on Ohio ratepayers, cooling will run closed-loop and air-cooled, and it will publish annual figures on hiring, water and energy use.<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/timesofindia.indiatimes.com\/technology\/tech-news\/openai-gets-nvidia-backing-for-its-ohio-datacenter-that-is-said-to-be-latest-complex-transaction-aimed-to-help-company-secure-mega-computing-capacity\/articleshow\/133299434.cms\" target=\"_blank\" rel=\"noopener\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Nvidia backs OpenAI&#8217;s 8GW Ohio data centre deal with SB Energy OpenAI has signed a 20-year lease for roughly 8 gigawatts of computing capacity in Pike County, Ohio, and Nvidia has agreed to stand behind it. The chipmaker will be the exclusive supplier of AI compute at SB Energy&#8217;s PORTS-Pike Technology Campus, invest $1.5 billion [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":13416,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[],"class_list":["post-13415","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-31"],"magazineBlocksPostFeaturedMedia":{"thumbnail":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg","medium":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg","medium_large":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg","large":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg","1536x1536":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg","2048x2048":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg","blogsy-small":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg","blogsy-small-tall":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg","blogsy-small-square":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg","blogsy-small-masonry":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg","blogsy-medium":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg","blogsy-medium-masonry":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg","blogsy-large":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg","blogsy-wide":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg"},"magazineBlocksPostAuthor":{"name":"admin","avatar":"https:\/\/secure.gravatar.com\/avatar\/8709732a479614e7a8aa24d3eb1b239f30dc6d90c61464ed495001e7a469d856?s=96&d=mm&r=g"},"magazineBlocksPostCommentsNumber":"0","magazineBlocksPostExcerpt":"Nvidia backs OpenAI&#8217;s 8GW Ohio data centre deal with SB Energy OpenAI has signed a 20-year lease for roughly 8 gigawatts of computing capacity in Pike County, Ohio, and Nvidia has agreed to stand behind it. The chipmaker will be the exclusive supplier of AI compute at SB Energy&#8217;s PORTS-Pike Technology Campus, invest $1.5 billion [&hellip;]","magazineBlocksPostCategories":["\u0b26\u0b47\u0b36 \u0b2c\u0b3f\u0b26\u0b47\u0b36"],"magazineBlocksPostViewCount":1,"magazineBlocksPostReadTime":3,"magazine_blocks_featured_image_url":{"full":["https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg",400,225,false],"medium":["https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg",300,169,false],"thumbnail":["https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/nvidia-backs-openais-8gw-ohio-data-centre-deal-with-sb-energy.jpg",150,84,false]},"magazine_blocks_author":{"display_name":"admin","author_link":"https:\/\/koshalsambada.in\/author\/admin"},"magazine_blocks_comment":0,"magazine_blocks_author_image":"https:\/\/secure.gravatar.com\/avatar\/8709732a479614e7a8aa24d3eb1b239f30dc6d90c61464ed495001e7a469d856?s=96&d=mm&r=g","magazine_blocks_category":"<a href=\"#\" class=\"category-link category-link-31\">\u0b26\u0b47\u0b36 \u0b2c\u0b3f\u0b26\u0b47\u0b36<\/a>","_links":{"self":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/posts\/13415","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=13415"}],"version-history":[{"count":0,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/posts\/13415\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/media\/13416"}],"wp:attachment":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=13415"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=13415"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=13415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}