{"id":12760,"date":"2026-08-15T17:53:46","date_gmt":"2026-08-15T17:53:46","guid":{"rendered":"https:\/\/koshalsambada.in\/?p=12760"},"modified":"2026-08-15T17:53:46","modified_gmt":"2026-08-15T17:53:46","slug":"100gw-of-nuclear-power-by-2047-5-reactors-this-decade-inside-pm-modis-energy-self-reliance-plan","status":"publish","type":"post","link":"https:\/\/koshalsambada.in\/?p=12760","title":{"rendered":"100GW of nuclear power by 2047, 5 reactors this decade: Inside PM Modi&#8217;s energy self-reliance plan"},"content":{"rendered":"<p><br \/>\n<\/p>\n<div>\n<div class=\"e9jwa\">\n<div class=\"vdo_embedd\">\n<div class=\"GfdvZ\">\n<section class=\"_bIDB  clearfix id-r-component leadmedia undefined undefined  E9tg9 \" style=\"top:0px\">\n<div class=\"_bIDB\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">\n<div class=\"ypVvZ\">\n<div class=\"WGttI\"><img src=\"https:\/\/static.toiimg.com\/thumb\/msid-133259845,imgsize-91787,width-400,height-225,resizemode-4\/pm-modi-12.jpg\" alt=\"100GW of nuclear power by 2047, 5 reactors this decade: Inside PM Modi's energy self-reliance plan\" title=\"Target of 100 GW of nuclear energy by 2047, 5 new nuclear reactors to be operational within 6-7 years: PM Modi\" decoding=\"async\" fetchpriority=\"high\"\/><\/div>\n<\/div>\n<\/div>\n<div class=\"Ta7d_ img_cptn\"><span title=\"Target of 100 GW of nuclear energy by 2047, 5 new nuclear reactors to be operational within 6-7 years: PM Modi\">Target of 100 GW of nuclear energy by 2047, 5 new nuclear reactors to be operational within 6-7 years: PM Modi<\/span><\/div>\n<\/section>\n<\/div><\/div>\n<\/div>\n<p>NEW DELHI: Prime Minister Narendra Modi on Saturday announced an expansion of India&#8217;s ambitious nuclear power programme, setting a target of 100 GW of nuclear power capacity by 2047.<span class=\"id-r-component br\" data-pos=\"2\"\/>PM Modi said five new nuclear reactors would be operationalised during this decade as the country seeks greater energy security and self-reliance.<span class=\"id-r-component br\" data-pos=\"4\"\/>Addressing the nation from the ramparts of the Red Fort on the 80th Independence Day, PM Modi said India had taken an important step towards self-reliance in nuclear energy with the 500 MWe Prototype Fast Breeder Reactor (PFBR) at Kalpakkam in Tamil Nadu attaining first criticality in April this year.<span class=\"id-r-component br\" data-pos=\"8\"\/>PM Modi said nuclear power would be an important component of India&#8217;s energy security as demand for electricity rises with the expansion of technologies such as semiconductors, artificial intelligence and data centres. He also referred to the government&#8217;s nuclear policy reforms and the SHANTI Act, enacted in December 2025, as part of efforts to expand the sector.<span class=\"id-r-component br\" data-pos=\"10\"\/>\u201cThe new world cannot run without energy. Whether they are (semiconductor) chips, AI or data centres, the country needs lots of electricity \u2026 That\u2019s why we have already taken strong steps to ensure energy security,\u201d he added.<span class=\"id-r-component br\" data-pos=\"13\"\/>PM Modi said India had set the goal of reaching 100 GW of nuclear power capacity by 2047, with five new reactors expected to become operational in the current decade.<span class=\"id-r-component br\" data-pos=\"15\"\/><\/p>\n<p><h2>India enters second stage of three-stage nuclear programme<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"17\"\/>The PFBR at Kalpakkam marks India&#8217;s entry into the second stage of its three-stage nuclear power programme, originally conceived by Homi J Bhabha.<span class=\"id-r-component br\" data-pos=\"19\"\/>The 500 MWe reactor, developed and built indigenously at the Kalpakkam Nuclear Complex, attained first criticality on April 6, 2026. <!-- -->It is being built by Bharatiya Nabhikiya Vidyut Nigam Limited, or BHAVINI, under the Department of Atomic Energy, with technology developed by the Indira Gandhi Centre for Atomic Research.<span class=\"id-r-component br\" data-pos=\"23\"\/>The first stage of India&#8217;s nuclear programme relies on Pressurised Heavy Water Reactors, or PHWRs, which use natural uranium as fuel and produce plutonium as a byproduct.<span class=\"id-r-component br\" data-pos=\"25\"\/>The second stage uses this plutonium in fast breeder reactors. <!-- -->The PFBR uses uranium-plutonium mixed oxide, or MOX, fuel and is designed to produce more fissile material than it consumes.<span class=\"id-r-component br\" data-pos=\"29\"\/>The third stage of the programme is aimed at using India&#8217;s large thorium reserves to produce uranium-233 for nuclear power generation.<span class=\"id-r-component br\" data-pos=\"31\"\/>The PFBR is therefore intended to serve as a bridge between India&#8217;s existing uranium-based nuclear programme and its longer-term thorium-based energy strategy.<span class=\"id-r-component br\" data-pos=\"34\"\/><\/p>\n<p><h2>Why PFBR matters for India&#8217;s nuclear expansion<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"36\"\/>The PFBR is a 500 MWe sodium-cooled fast breeder reactor designed to use plutonium-based fuel while breeding additional fissile material.<span class=\"id-r-component br\" data-pos=\"38\"\/>A blanket of uranium-238 around the reactor core can be converted into plutonium-239 through the action of fast neutrons. This allows the reactor to generate electricity while producing additional fuel.<span class=\"id-r-component br\" data-pos=\"40\"\/>The reactor&#8217;s technology is particularly relevant to India&#8217;s nuclear strategy because the country has relatively limited uranium resources but substantial thorium reserves.<span class=\"id-r-component br\" data-pos=\"43\"\/>The Department of Atomic Energy has said the PFBR will eventually help lay the foundation for the third stage of India&#8217;s nuclear programme, in which thorium would be used to produce uranium-233.<span class=\"id-r-component br\" data-pos=\"45\"\/>PM Modi had earlier described the PFBR milestone as a major development in India&#8217;s civil nuclear programme.<span class=\"id-r-component br\" data-pos=\"47\"\/>\u201cToday, India takes a defining step in its civil nuclear journey, advancing the second stage of its nuclear programme.\u201d<span class=\"id-r-component br\" data-pos=\"50\"\/>PM Modi had also said, \u201cThis advanced reactor, capable of producing more fuel than it consumes, reflects the depth of our scientific capability and the strength of our engineering enterprise. It is a decisive step towards harnessing our vast thorium reserves in the third stage of the programme.\u201d<span class=\"id-r-component br\" data-pos=\"52\"\/><\/p>\n<p><h2>Nuclear power seen as key to meeting rising electricity demand<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"54\"\/>In his Independence Day address, PM Modi linked India&#8217;s nuclear expansion with the country&#8217;s rapidly increasing demand for electricity.<span class=\"id-r-component br\" data-pos=\"57\"\/>He pointed to the growing power requirements of semiconductor manufacturing, artificial intelligence and data centres, saying energy security would become increasingly important as India expands its technology and manufacturing sectors.<span class=\"id-r-component br\" data-pos=\"59\"\/>\u201cIt is difficult to build a new world. That is why, whether it is a chip, AI, or data centre, we need electricity in large quantity. The new era demands energy.\u201d<span class=\"id-r-component br\" data-pos=\"61\"\/>PM Modi said India had taken steps to strengthen energy security by expanding both nuclear and renewable energy capacity.<span class=\"id-r-component br\" data-pos=\"64\"\/>He said nuclear energy was vital for ensuring a stable supply of electricity while the country simultaneously expands solar, wind and other renewable sources.<span class=\"id-r-component br\" data-pos=\"66\"\/><\/p>\n<p><h2>India targets 500 GW renewable energy by 2030<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"68\"\/>Alongside the nuclear expansion, PM Modi highlighted the growth of India&#8217;s renewable energy capacity.<span class=\"id-r-component br\" data-pos=\"70\"\/>He said India&#8217;s solar energy capacity had risen from 2 GW in 2014 to 160 GW, while the country had set a target of 500 GW of renewable energy capacity by 2030.<span class=\"id-r-component br\" data-pos=\"73\"\/>PM Modi also referred to the PM Surya Ghar Muft Bijli Yojana, saying around 50 lakh households had been covered under the rooftop solar programme.<span class=\"id-r-component br\" data-pos=\"75\"\/>Thousands of consumers, he said, were also earning through electricity generated from rooftop solar systems.<span class=\"id-r-component br\" data-pos=\"77\"\/>Beneficiaries under the scheme can receive a subsidy of up to Rs 80,000 per household for installing rooftop solar systems.<span class=\"id-r-component br\" data-pos=\"79\"\/>PM Modi also said India&#8217;s railway electrification had expanded sharply, helping reduce diesel consumption and imports.<span class=\"id-r-component br\" data-pos=\"82\"\/>He said India had also started work on a hydrogen train as part of its broader clean-energy transition.<span class=\"id-r-component br\" data-pos=\"84\"\/><\/p>\n<p><h2>SHANTI Act seeks to reshape India&#8217;s nuclear power framework<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"86\"\/>PM Modi also referred to the Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India, or SHANTI Act, enacted in December 2025.<span class=\"id-r-component br\" data-pos=\"88\"\/>The legislation is intended to modernise India&#8217;s nuclear legal framework and facilitate greater participation in the nuclear sector under regulatory oversight.<span class=\"id-r-component br\" data-pos=\"91\"\/>The law forms part of the government&#8217;s broader effort to expand nuclear power capacity and bring new investment and technology into the sector.<span class=\"id-r-component br\" data-pos=\"93\"\/>The Union Budget 2025-26 had also announced a Nuclear Energy Mission with an allocation of Rs 20,000 crore for the design, development and deployment of Small Modular Reactors.<span class=\"id-r-component br\" data-pos=\"95\"\/>The government has set a target of having at least five indigenously designed small modular reactors operational by 2033.<span class=\"id-r-component br\" data-pos=\"98\"\/><\/p>\n<p><h2>India\u2019s nuclear capacity to expand from 8.78 GW<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"100\"\/>India&#8217;s installed nuclear power capacity currently stands at around 8.78 GW, according to government data.<span class=\"id-r-component br\" data-pos=\"102\"\/>Nuclear power accounted for about 3.1% of India&#8217;s electricity generation in 2024-25, when nuclear plants generated 56,681 million units of electricity.<span class=\"id-r-component br\" data-pos=\"104\"\/>The government has projected that India&#8217;s nuclear capacity could reach around 22.38 GW by 2031-32 through the development of indigenous 700 MW reactors and larger reactors being developed through international cooperation.<span class=\"id-r-component br\" data-pos=\"107\"\/>The 100 GW target by 2047 would therefore require a substantial expansion in both the number and scale of nuclear power projects over the next two decades.<span class=\"id-r-component br\" data-pos=\"109\"\/><\/p>\n<p><h2>Five reactors to be operationalised this decade<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"111\"\/>PM Modi said India would operationalise five nuclear reactors during the current decade as part of its push towards greater nuclear capacity.<span class=\"id-r-component br\" data-pos=\"113\"\/>The expansion is expected to involve multiple reactor technologies, including India&#8217;s indigenous PHWR designs and advanced reactor technologies.<span class=\"id-r-component br\" data-pos=\"116\"\/>The government is also developing small modular reactor designs, including the 200 MWe Bharat Small Modular Reactor and the 55 MWe SMR-55, as well as other advanced reactor concepts.<span class=\"id-r-component br\" data-pos=\"118\"\/>The expansion is aimed at increasing the contribution of nuclear energy to India&#8217;s electricity mix while maintaining the country&#8217;s broader clean-energy and net-zero commitments.<\/p>\n<div class=\"LEzX4\">\n<div class=\"PmOGb\">\n<p class=\"PSf84\">Share your thoughts in the comments<\/p>\n<\/div>\n<p><button type=\"button\" class=\"sUTYm \">Insightful<\/button><button type=\"button\" class=\"sUTYm \">Agree<\/button><button type=\"button\" class=\"sUTYm \">Disagree<\/button><button type=\"button\" class=\"sUTYm \">Skeptical<\/button><button type=\"button\" class=\"sUTYm \">Concerning<\/button><button type=\"button\" class=\"sUTYm \">Promising<\/button><button type=\"button\" class=\"sUTYm \">Worth Reading<\/button><button type=\"button\" class=\"sUTYm \">Big Development<\/button><\/p>\n<p><textarea class=\"T9MbS\" rows=\"1\" placeholder=\"Add your Thoughts...\"\/><button type=\"button\" class=\"ZW6JD \" disabled=\"\">Post Comment<\/button><\/p>\n<p class=\"swnca\">Be respectful \u00b7 <a href=\"https:\/\/www.indiatimes.com\/termsandcondition\" target=\"_blank\" rel=\"noopener noreferrer\" class=\"gkv0P\">TOI community guidelines<\/a><\/p>\n<\/div>\n<p><span class=\"id-r-component br\" data-pos=\"121\"\/><\/p>\n<p><h2>Nuclear power and India&#8217;s 2070 net-zero target<\/h2>\n<\/p>\n<p><span class=\"id-r-component br\" data-pos=\"123\"\/>The expansion of nuclear power is also linked to India&#8217;s commitment to achieve net-zero carbon emissions by 2070.<span class=\"id-r-component br\" data-pos=\"126\"\/>Unlike solar and wind power, nuclear reactors can provide continuous electricity and are not dependent on weather conditions. This makes nuclear generation a potential source of firm, low-carbon electricity alongside renewable energy.<span class=\"id-r-component br\" data-pos=\"128\"\/>The government has therefore positioned nuclear power as part of a wider energy mix that includes solar, wind, hydrogen and other clean-energy sources.<span class=\"id-r-component br\" data-pos=\"130\"\/>PM Modi&#8217;s announcement of the 100 GW target marks a substantial increase in India&#8217;s long-term nuclear ambitions and places nuclear power at the centre of the country&#8217;s energy security strategy as it works towards the Viksit Bharat 2047 goal.<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/timesofindia.indiatimes.com\/india\/100gw-of-nuclear-power-by-2047-5-reactors-this-decade-inside-pm-modis-energy-self-reliance-plan\/articleshow\/133257863.cms\" target=\"_blank\" rel=\"noopener\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Target of 100 GW of nuclear energy by 2047, 5 new nuclear reactors to be operational within 6-7 years: PM Modi NEW DELHI: Prime Minister Narendra Modi on Saturday announced an expansion of India&#8217;s ambitious nuclear power programme, setting a target of 100 GW of nuclear power capacity by 2047.PM Modi said five new nuclear [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":12761,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[],"class_list":["post-12760","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-31"],"magazineBlocksPostFeaturedMedia":{"thumbnail":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg","medium":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg","medium_large":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg","large":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg","1536x1536":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg","2048x2048":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg","blogsy-small":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg","blogsy-small-tall":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg","blogsy-small-square":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg","blogsy-small-masonry":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg","blogsy-medium":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg","blogsy-medium-masonry":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg","blogsy-large":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg","blogsy-wide":"https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg"},"magazineBlocksPostAuthor":{"name":"admin","avatar":"https:\/\/secure.gravatar.com\/avatar\/8709732a479614e7a8aa24d3eb1b239f30dc6d90c61464ed495001e7a469d856?s=96&d=mm&r=g"},"magazineBlocksPostCommentsNumber":"0","magazineBlocksPostExcerpt":"Target of 100 GW of nuclear energy by 2047, 5 new nuclear reactors to be operational within 6-7 years: PM Modi NEW DELHI: Prime Minister Narendra Modi on Saturday announced an expansion of India&#8217;s ambitious nuclear power programme, setting a target of 100 GW of nuclear power capacity by 2047.PM Modi said five new nuclear [&hellip;]","magazineBlocksPostCategories":["\u0b26\u0b47\u0b36 \u0b2c\u0b3f\u0b26\u0b47\u0b36"],"magazineBlocksPostViewCount":1,"magazineBlocksPostReadTime":7,"magazine_blocks_featured_image_url":{"full":["https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg",400,225,false],"medium":["https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg",300,169,false],"thumbnail":["https:\/\/koshalsambada.in\/wp-content\/uploads\/2026\/08\/pm-modi-12.jpg",150,84,false]},"magazine_blocks_author":{"display_name":"admin","author_link":"https:\/\/koshalsambada.in\/author\/admin"},"magazine_blocks_comment":0,"magazine_blocks_author_image":"https:\/\/secure.gravatar.com\/avatar\/8709732a479614e7a8aa24d3eb1b239f30dc6d90c61464ed495001e7a469d856?s=96&d=mm&r=g","magazine_blocks_category":"<a href=\"#\" class=\"category-link category-link-31\">\u0b26\u0b47\u0b36 \u0b2c\u0b3f\u0b26\u0b47\u0b36<\/a>","_links":{"self":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/posts\/12760","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=12760"}],"version-history":[{"count":0,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/posts\/12760\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=\/wp\/v2\/media\/12761"}],"wp:attachment":[{"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=12760"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=12760"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/koshalsambada.in\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=12760"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}